- Visual Inspection - pipe, wing, threads, welds, etc.
- Ultrasonic Test (UT) the pipe.
- Visual Inspection.
- Visual Inspection - Edit Asset Banding Equipment with existing asset bands having new certification date added to band.
- Equipment without asset bands will have one added with asset number provided by Mountain Pressure Testing (unless customer supplies asset band).
- Pressure Test up to 250 psi over the maximum working pressure.
- Grinding of all Wing Nuts.
- Lip Seal Inspection.
- Retaining Ring.
- Inspection of sub ends (M & F) and segments.
- Documentation of results upon request.
- Grease all valves, swivels, etc.
- Breakdown and Reassembly of Plug Valves, Swivels, etc.