The technology advances available to operators in the oil and gas industry has changed the methods and practices of completing wells. With the adaptation of changing times, laterals have reached lengths that were unprecedented just a few short years ago. With the extended reach well laterals, many operators are facing challenges using coiled tubing reaching total depth (TD) in a traditional method of milling plugs following a plug-and-perf style fracturing system. Failing to reach TD will leave multiple frac stages unable to produce in addition to adding total costs to the well.
The combination of Legend Energy Services “Super String” design and the superior quality of Mountain Supply and Service chemicals provided a significantly enhanced job performance to the operator. Total depth was reached on all wells on the pad in record time; thus, the operator was able to realize a significant cost savings through reduced job time and chemical consumption.
Read all about it in this case study